National Grid Interview 2026: 4 Stages, 30 Questions & £38,472 Pay
National Grid interview guide 2026: video interview, game-based tests, assessment centre, apprentice and engineer rounds, 30 questions and GBP pay.
Last updated: November 2026
TL;DR
The National Grid interview process for graduates and early careers is an online application, a recorded video interview, game-based assessments, then an assessment centre with a case study presentation, a group exercise and a strengths or competency interview; apprentices apply by depot and attend an assessment centre, and experienced hires go from application to a hiring manager interview or panel. National Grid does not publish a timeline: graduate assessment centres run between November and April, and candidates report about four weeks to two months for experienced roles (candidate-reported). Rehearse the video interview and the assessment centre interview in OphyAI Interview Practice, and if a live interview runs on Zoom, Microsoft Teams or Google Meet, OphyAI Interview Copilot gives real-time answer suggestions from a live transcript.
Quick Answer: National Grid Interview Process
| Stage | What to prepare |
|---|---|
| Online application | Degree or GCSE evidence, right to work, driving licence status, one programme choice only |
| Recorded video interview | Short strengths and competency answers on motivation, teamwork and safety |
| Game-based assessments | Calm, consistent play; a quiet room and a stable connection |
| Assessment centre | Case study presentation, group exercise, strengths or competency interview |
| Experienced roles | A hiring manager interview or panel with technical and behavioural questions |
| Offer and checks | Right to work, basic DBS, and National Security Vetting for some roles |
Action Plan: Prepare for National Grid by Round
| Round | What National Grid tests | What to do before the interview |
|---|---|---|
| Application | Eligibility for one programme and one location | Pick one role; check the degree class, licence and living-distance rules in the advert |
| Video interview | Motivation, workstyle, clear communication | Record 60-90 second answers to “why National Grid” and three STAR stories |
| Game-based assessments | Cognitive, emotional and social traits | Play in one sitting, rested, and do not try to “game” the games |
| Presentation | Structuring a case under time pressure | Practise a 10-minute presentation built in 90 minutes from a case pack |
| Group exercise | Teamwork, listening, adapting when facts change | Run a mock group task where someone changes the brief halfway |
| Strengths interview | What energises you and how you work | Prepare examples of what you enjoy and do well, not only what you achieved |
With one week: two days on the video interview, two on a timed case presentation, one on group exercise behaviour and one on safety stories. Know the advert’s business unit (Electricity Transmission, Electricity Distribution, Strategic Infrastructure, Interconnectors or IT and Digital).
What Makes National Grid Different
National Grid owns and runs the high-voltage electricity transmission network in England and Wales, the distribution networks of National Grid Electricity Distribution (NGED), whose current apprentice adverts run from Lincoln to Barnstaple, an Interconnectors business, and regulated networks in New York and New England in the US. The Electricity System Operator is no longer part of the group: it moved into public ownership as the National Energy System Operator (NESO) on 1 October 2024, so “control room” graduate roles at NESO are a separate employer.
In its results for the year to 31 March 2026, published on 14 May 2026, National Grid reported record capital investment of £11.6 billion (up from £9.8 billion) and operating profit up 10% to £5.43 billion, and it plans to invest at least £70 billion over the five years from 2026/27 to 2030/31 (AJ Bell). An earnings call summary says around £29 billion of that goes to New York and New England, and that National Grid expects to recruit around 6,000 full-time employees in the UK, including 2,000 graduates and apprentices (Yahoo Finance).
Four things shape what National Grid interviewers look for:
- Safety first, every time. Substations, overhead lines and live cables are dangerous; adverts require Senior Authorised Person (SAP) status for senior safety roles and list safety qualifications such as NEBOSH and IOSH.
- Building at scale. The £70 billion plan makes project delivery and contracts skills as valuable as electrical engineering.
- National security. Some graduate roles need SC-level National Security Vetting and five years’ continuous UK residence.
- Location matters. Apprentice adverts require you to live within 30 minutes of the depot, and many graduate roles need a full UK driving licence.
If any National Grid interview is a video call, OphyAI Interview Copilot suggests answers in real time from a live transcript on Zoom, Microsoft Teams and Google Meet. In the desktop app the answer window is excluded from screen sharing and recording, which does not hide it from a webcam or a person in the room.
Interview Process Overview
| Stage | Format | Duration | Timeline |
|---|---|---|---|
| Online application | Online form with motivation questions; one Early Careers or Career Changer programme only | About an hour (WikiJob) | Rolling; adverts may close early |
| Video interview | Recorded, answered when it suits you | Three short questions in older guides; 5-6 questions reported recently (candidate-reported) | Within days of applying |
| Game-based assessments | Short online games | Not published | After the video interview |
| Assessment centre | Presentation, group exercise, interview; virtual or in person | About a day (candidate-reported 6 hours) | Held November to April for 2026 entry |
| Experienced hire interview | Hiring manager interview or panel | Not published | Whole process about 4 weeks to 2 months (candidate-reported) |
| Offer and checks | Right to work, basic DBS; vetting for some roles | Not published | Before your start date |
The Online Application
Graduate adverts for September 2027 say recruitment is rolling, that National Grid “may close our vacancies early once we have enough applications”, and that you can apply for “only one opportunity across all Early Careers and Career Changer programmes”. The minimum is a 2:2 in a listed subject, and “it doesn’t matter when you graduated”.
What they test: eligibility and a genuine reason for choosing one programme and one business unit.
Red flags: a region you cannot reach, a missed licence rule, or generic motivation answers.
How to prepare: read the requirements line by line, then tailor your CV in OphyAI Resume Builder and draft motivation answers with Application Assistant.
The Recorded Video Interview
Guides describe recorded competency questions about your work ethic and personality, completed “in a time and place that suits you”. Recent candidates describe a HireVue-style recording with about five or six questions (candidate-reported).
What they test: motivation for the energy sector, communication, and early evidence of teamwork and safety awareness.
Red flags: reading from notes, running out of time, or a “why National Grid” about salary alone.
How to prepare: record answers to “why National Grid”, “why this programme” and three STAR stories, then watch them back. OphyAI’s desktop One-way Interview mode reads each recorded question as it appears on your screen and suggests an answer in the overlay; see our HireVue interview guide for the format. Screen-share exclusion does not hide anything from your webcam.
The Game-Based Assessments
Guides describe short online games that look at cognitive, emotional and social traits; older guides describe SHL reasoning tests and a situational judgement test instead, so the mix varies by year and stream.
What they test: problem-solving, attention and work style.
Red flags: playing tired or distracted, or rushing through instructions.
How to prepare: play in one sitting in a quiet room. For situational judgement items, use our situational judgment test guide. Where a stream uses multiple-choice reasoning tests, the desktop Aptitude Test mode reads each question on screen and shows an answer with a one-line reason in a popup excluded from screen sharing and recording; it is not hidden from a webcam, a person in the room, or proctoring software.
Offer and Checks
Adverts require an existing UK right to work (National Grid generally does not sponsor visas). Apprentices need a basic DBS check; Interconnectors graduates need SC-level vetting, a British passport or eligibility for one, and five years’ continuous UK residence.
What they test: identity, right to work and suitability for critical national infrastructure.
Red flags: unexplained residence gaps or missing certificates.
How to prepare: gather certificates and addresses for the last five years early, and log every deadline in OphyAI Application Tracker.
The Graduate Assessment Centre
Guides describe three core exercises: a case study presentation, a group exercise and an interview. A September 2025 HR graduate review calls the centre “strengths based instead of capability based” (Higherin), and candidates describe virtual days with a networking session, presentation and interview (candidate-reported).
| Exercise | What happens | What assessors look for |
|---|---|---|
| Case study presentation | About 90 minutes to prepare a case, then about 10 minutes to present | Structure, prioritisation, a clear recommendation |
| Group exercise | A team task on a fictional business scenario; facts may change partway | Listening, collaboration, adapting, not dominating |
| Strengths or competency interview | About 45-60 minutes; technical questions for engineering roles | Specific examples, energy-sector awareness, values |
| Technical tests (some craft streams) | Manual dexterity (a bus bar termination) or a working at heights test with a climbing instructor | Safe, careful technique |
What they test: thinking on your feet, working with strangers and linking your strengths to the role.
Red flags to avoid:
- A presentation with no recommendation, or one that runs well over 10 minutes.
- Talking over others in the group task, or freezing when the brief changes.
- Strengths answers with no example of when you used the strength.
How to prepare: build two timed mock presentations from a one-page case (say, connecting a new solar farm) and present them aloud in OphyAI Interview Practice, which asks follow-up questions and gives per-answer feedback. Candidates report receiving a pack of around 12 interview questions in advance, with only some asked plus follow-ups (candidate-reported), so prepare an example for each. See our group interview questions guide.
Role-Specific Breakdowns
Graduate Development Programme (Engineering)
Engineering streams include substations, asset management, power systems, innovation and interconnectors. Adverts for September 2027 offer an 18-month programme of three 6-month placements across the UK, a starting salary of £38,472, a £2,000 joining bonus and a £2,400 payment on completion. Some roles need a full UK driving licence before the start, with the theory test passed before the assessment centre. Rehearse a power systems or asset question with follow-ups in Interview Practice until you can explain it to a non-engineer.
Graduate Business, Digital and Data Roles
Non-engineering graduate streams include HR, finance, procurement, contracts, risk and planning, strategy and IT and Digital (data, software and cyber). The Data Specialist advert accepts a 2:2 in subjects from Computer Science to Geography and asks for three office days a week. Industrial placements (£24,109 in 2026, penultimate-year students) use the same assessment centre. For a live technical interview in IT and Digital, OphyAI Coding Copilot (Premium, desktop app) shows the approach, the code, a dry run and the Big O.
Advanced, Higher and Degree Apprenticeships
NGED Advanced Apprentice adverts for September 2027 (Overhead Lines, Jointer, Projects Fitter) start at £19,366 and rise to £45,492 on completion after about three years, with a 12-week residential induction at training centres. You need GCSE English, Maths and Science at grade 4/C plus two other GCSEs, and you must live within 30 minutes of the depot. Electricity Transmission Substation Engineer apprentices started at £24,306 in 2026, and 2027 degree apprenticeships start from £25,355. Practise “why this trade” and safety answers aloud in Interview Practice.
Experienced Engineers and Field Roles
Live November 2026 adverts include OHL Engineer (£49,625-£54,041 plus bonus), Project Supervisor (£49,625-£54,000 plus a company vehicle) and Senior Safety Engineer (£65,000-£75,000, SAP status and 66kV+ experience required). Adverts give interview weeks but not formats; candidates describe a hiring manager interview or panel mixing technical and competency questions (candidate-reported). For a video panel, Interview Copilot suggests structured answers on Zoom, Teams or Meet.
Corporate and Digital Experienced Hires
Corporate roles span legal, project management, product and technology. A November 2026 UI Engineer advert pays circa £57,000-£68,000, hybrid from Warwick, Bristol or Cardiff, for Angular and TypeScript skills. Practise competency and technical answers in OphyAI Interview Practice and see our project manager interview questions.
US Field Roles: Lineworkers in New York and Massachusetts
US field roles sit under union collective bargaining agreements. A March 2025 Lineworker Apprentice advert in Western Massachusetts paid $39.86 an hour and required a high school diploma, a CDL with endorsements, a DOT physical, a mechanical aptitude screening (“Test on Record”), Pre-Overhead Line School and a Field Assessment Test; the role is covered by federal DOT drug and alcohol rules. Experienced Journeyperson Lineworkers (1/c) are advertised at $63.63 an hour. We could not source a CPAT-style physical test for National Grid. Rehearse safety and storm-duty answers in Interview Practice.
Common Questions with Frameworks
Questions 1-6 come from Glassdoor review listings and the guides in our sources (candidate-reported). Questions 7-30 are our examples built on National Grid’s adverts, values and business; National Grid does not publish its question bank.
1. “There are many competitors in the energy industry. Why do you want to join National Grid?” (Motivation)
Name something specific: the £70 billion plan or the advert’s business unit. Our why do you want to work here guide helps.
2. “How does your background fit this role?” (Video interview)
Two or three facts that map to the advert, then why the role is next.
3. “Tell me about a time you were given confusing information.” (Strengths and competency)
STAR: what was unclear, the questions you asked, how you checked your understanding, the result.
4. “What is your weakness?” (Self-awareness)
A real, non-critical weakness and what you do about it. See our greatest weakness guide.
5. “How would your friends describe you?” (Strengths)
Three words, each with a short example; one should link to teamwork.
6. “What type of work environment do you enjoy?” (Workstyle)
Be honest and link it to the rotations or site work in the advert.
7. “Talk us through your presentation recommendation.” (Assessment centre)
Recommendation first, three reasons, the biggest risk and how you would manage it, in about 10 minutes.
8. “Tell me about yourself.” (Introduction)
Sixty seconds: studies or current role, one strength for the programme, why energy now. See our tell me about yourself guide.
9. “What do you know about National Grid?” (Company knowledge)
Transmission in England and Wales, NGED distribution, interconnectors, US networks, and that NESO is now separate.
10. “What is the biggest challenge facing the electricity network?” (Commercial awareness)
Connecting new generation and demand fast enough, building new lines and substations, and keeping bills fair.
11. “Tell me about a time you put safety first.” (Do the right thing)
What the risk was, how you stopped or escalated, what changed afterwards.
12. “Tell me about a time you found a better way of doing something.” (Find a better way)
Baseline, your idea, how you tested it, the measurable result.
13. “Tell me about a time you took ownership to deliver a result.” (Make it happen)
A deadline, the obstacles, what you personally did, the outcome.
14. “Describe a time you worked in a team with different views.” (Teamwork)
How you listened, found common ground and what the team delivered.
15. “What would you do if the facts changed halfway through a task?” (Group exercise)
Pause, re-read the new information, agree priorities with the group, adjust the plan.
16. “What are you naturally good at, and when did you use it?” (Strengths)
One strength, one example, and how it fits the programme.
17. “Why this business unit or programme?” (Motivation)
Link a module, project or job to the unit’s work: substations, distribution, interconnectors or digital.
18. “How would you explain a technical problem to a customer or landowner?” (Communication)
Plain words, the impact on them, what happens next and when.
19. “Explain how electricity gets from a power station to a home.” (Technical, engineering)
Generation, step-up, transmission, substations, distribution, the customer; mention where National Grid sits.
20. “What is a Senior Authorised Person and why does it matter?” (Technical, substations)
In UK utilities, a SAP is typically the person authorised to carry out switching and issue safety documents on high-voltage plant; Substation Engineer trainees work towards it, and senior safety adverts require it.
21. “Tell me about a project you planned and delivered.” (Project delivery)
Scope, programme, risks, stakeholders and result; mention CDM or NEC contracts if you know them.
22. “How do you manage a contractor who is behind schedule?” (Strategic Infrastructure)
Facts first, a joint recovery plan, contract mechanisms, escalation if needed.
23. “How would you prioritise maintenance with a limited budget?” (Asset management)
Risk-based: condition, criticality, consequence of failure and customer impact.
24. “Tell me about a time you analysed data to make a decision.” (Data and digital)
The question, the data, the method, the decision and what it changed.
25. “How would you secure an operational technology system?” (Cyber)
Segmentation, access control, monitoring, patching windows and incident response, with safety in mind.
26. “Why do you want this apprenticeship, and why this trade?” (Apprentices)
What drew you to the trade, practical work you have done, and that you understand outdoor and on-call work.
27. “How do you feel about working at heights and in all weathers?” (Overhead lines)
Honest comfort with heights, a physical job you have done, and respect for safety rules.
28. “Tell me about a time you helped a colleague learn something.” (Mentoring)
What they needed, how you explained it, what they could do afterwards.
29. “How do you stay safe during storm restoration?” (US lineworkers)
Fatigue management, hazard checks, crew communication and switching and tagging rules.
30. “Where do you see yourself in five years?” (Career)
A realistic path: chartership, SAP or a specialist role, linked to the programme’s development.
Run all thirty in OphyAI Interview Practice and see our STAR method complete guide and situational interview questions.
Culture Fit: Do the Right Thing, Find a Better Way, Make It Happen
Do the right thing. In practice: safety, honesty and customers first. What interviewers screen for: you stop a job when it is unsafe and you are honest when you get something wrong.
Find a better way. In practice: improving how work is done, together. What interviewers screen for: curiosity, ideas you have tested, and openness to new technology.
Make it happen. In practice: ownership and delivery. What interviewers screen for: ownership of a deadline and evidence that you finish what you start.
Compensation Overview (2026 Estimates, GBP)
Figures come from adverts and listings read in November 2026. No adverts offer an equity grant, though Sharesave and a Share Incentive Plan are offered.
| Role | Base Salary | Total Compensation (Base + Bonus + Equity) |
|---|---|---|
| Graduate, September 2027 intake (advert) | £38,472, with annual increases | £2,000 joining bonus; £2,400 on completion; up to £200 a month accommodation allowance |
| Graduate, 2026 intake (listing) | £36,640 | Same £2,000 and £2,400 payments |
| Industrial placement, 2026 (listing) | £24,109 | 26 days’ holiday; pension |
| Degree apprentice, 2027 (listing) | From £25,355 | Fully funded degree; Sharesave |
| NGED Advanced Apprentice, 2027 (advert) | £19,366, rising to £45,492 on completion | Pension double matched up to 12% |
| ET Substation Engineer Apprentice, 2026 (listing) | £24,306 | Up to £250 bonus; standby payments |
| Health and Safety Coordinator, Leeds (advert) | £45,308-£47,975 | Company car; annual bonus (2026 target 4%); paid overtime |
| OHL Engineer, Walsall (advert) | £49,625-£54,041 | Performance bonus |
| Project Supervisor, South West Wales (advert) | £49,625-£54,000 | Company vehicle |
| UI Engineer, IT and Digital (advert) | Circa £57,000-£68,000 | Pension double matched up to 6%; life insurance 10x salary |
| Senior Safety Engineer, Electricity Transmission (advert) | £65,000-£75,000 | Annual performance bonus; job requirement car |
US (USD): Lineworker Apprentice, Western Massachusetts, $39.86 an hour (March 2025 advert); Experienced Journeyperson Lineworker 1/c, $63.63 an hour. See our salary negotiation guide before discussing an experienced offer.
Preparation Timeline: 4-6 Weeks
| Week | Focus | Activities |
|---|---|---|
| 1 | Choose one role | Read the business unit, location, licence and vetting rules; apply early because adverts close when full |
| 2 | Video interview | Record “why National Grid” and three STAR stories; cut each to 60-90 seconds |
| 3 | Games and tests | One calm sitting; situational judgement practice; reasoning drills if your stream uses them |
| 4 | Assessment centre | Two timed case presentations; one mock group exercise with a changing brief |
| 5 | Mock interviews | The thirty questions above in OphyAI Interview Practice; fix your two weakest |
| 6 | Checks and questions | Five-year address history, certificates, licence evidence and questions for assessors |
Common Mistakes
Applying for the wrong programme. You get one Early Careers or Career Changer application per cycle, so choose the role you can actually reach and want.
Ignoring location and licence rules. Apprentices must live within 30 minutes of the depot; many graduate roles need a UK licence.
Presenting without a recommendation. Assessors want a clear answer in about 10 minutes, not a summary of the case pack.
Leaving safety out. In a company that works on live high-voltage assets, a technical answer without safety is incomplete.
Prepare for National Grid with OphyAI
National Grid’s processes are long and structured, so rehearsal decides the outcome. Use OphyAI Interview Practice for voice or text mock interviews with follow-up questions, a transcript and per-answer feedback. Use OphyAI Interview Copilot for real-time answer suggestions on live Zoom, Microsoft Teams or Google Meet interviews; in the desktop app the window is excluded from screen sharing and recording, though not from a webcam or a person in the room. For the recorded video stage, the desktop One-way Interview mode suggests answers as each question appears, and Aptitude Test mode handles multiple-choice tests. OphyAI runs on web, Mac, Windows, iPhone and Android. Start practicing →
Start Your National Grid Application
Ready to apply? OphyAI can help at every stage:
- Search for open roles at National Grid and similar employers with AI-powered job matching
- Generate a tailored cover letter that highlights your fit for the role, plus follow-up emails and thank-you notes for after your interviews
- Track your application status alongside every other role you’re pursuing
Pair these with Interview Copilot for structured live interviews, or practise first with OphyAI Interview Practice.
Related company guides
- Rolls-Royce interview guide
- BAE Systems interview guide
- Siemens interview guide
- Octopus Energy interview guide
- Hydro One interview guide
For British interview habits, see our UK interview guide.
Frequently Asked Questions
What is the National Grid interview process?
For graduates and early careers: an online application, a recorded video interview, game-based assessments, then an assessment centre with a case study presentation, a group exercise and a strengths or competency interview. Apprentices apply to a specific depot and attend an assessment centre. Experienced hires usually go from application to a hiring manager interview or panel, then checks.
What happens at the National Grid assessment centre?
Guides describe a case study presentation (about 90 minutes to prepare, about 10 to present), a group exercise where the facts may change, and a strengths or competency interview of about 45-60 minutes. Some craft streams add a dexterity or working at heights test.
How much does the National Grid graduate scheme pay?
Adverts for the September 2027 intake offer a starting salary of £38,472 with annual increases, a £2,000 joining bonus, a £2,400 payment on completing the 18-month programme, and up to £200 a month accommodation allowance during placements. The 2026 intake listings showed £36,640 with the same joining and completion payments.
What is the National Grid video interview like?
It is a recorded interview you complete when it suits you, with competency and strengths questions on motivation, workstyle and teamwork. Older guides mention three short questions; recent candidates report a HireVue-style recording with about five or six questions, including how your background fits the role (candidate-reported). Practise answers of 60-90 seconds.
How much do National Grid apprentices earn?
NGED Advanced Apprentice adverts for September 2027 start at £19,366 and rise to £26,086 in year two, £39,508 in year three and £45,492 on completion. Electricity Transmission Substation Engineer apprentices started at £24,306 in 2026, and 2027 degree apprenticeships start from £25,355, all with a double-matched pension.
Can I apply for more than one National Grid graduate role?
No. Current graduate adverts say you can apply for only one opportunity across all Early Careers and Career Changer programmes, and recruitment is rolling, so vacancies may close early once enough applications arrive. Choose the role you want most and apply early.
How long does the National Grid hiring process take?
National Grid does not publish a timeline. For 2026 entry, graduate and apprentice assessment centres ran between November and April, so early careers decisions can take several months. Experienced candidates report about four weeks to two months from application to offer (candidate-reported), and adverts often give a set interview week.
How does OphyAI work in a National Grid interview?
Rehearse the video interview, strengths questions and a timed case presentation in Interview Practice, with follow-ups and per-answer feedback. On a live video interview, Interview Copilot suggests answers in real time on Zoom, Teams or Meet. The desktop app adds One-way Interview mode for recorded rounds; screen-share exclusion does not hide anything from a webcam, a person in the room, or proctoring software.
Sources and verification notes
All sources checked November 2026. nationalgrid.com (careers, investor and annual report pages) returned 403 and jobs.nationalgrid.com loaded without text, so early careers stages come from third-party guides; live adverts on jobs-ats.nationalgrid.com were read directly. Glassdoor and Gradcracker returned 403, so video interview length, assessment centre length, questions in advance, experienced timelines and questions 1-6 are candidate-reported from search listings. Group headcount and any US physical test could not be verified.
- Live National Grid adverts (November 2026): Graduate Data Specialist, IT and Digital, Graduate Asset Engineer, Interconnectors, Overhead Lines Advanced Apprentice, Lincoln, Projects Fitter Advanced Apprentice, Tipton, Health and Safety Coordinator, OHL Engineer, Project Supervisor, Senior Safety Engineer, UI Engineer.
- Higherin listings: Graduate Electrical Engineer 2026, Tipton, Transmissions Engineer Placement 2026, Substation Engineer Apprenticeship 2026, Jointer Apprenticeship 2026, Degree Apprenticeships 2027, and reviews by an HR graduate (September 2025) and a graduate asset management engineer (March 2026).
- Process guides: WikiJob, National Grid application process (updated June 2025), Psychometrictests.org (updated May 2024), JobTestPrep and Practice Aptitude Tests.
- US: Lineworker Apprentice, MA West (posted March 2025) and Experienced Journeyperson Lineworker, Brockton.
- Results: AJ Bell, National Grid to invest £70 billion (14 May 2026) and Yahoo Finance earnings call summary (May 2026).
- NESO launch announcement (26 September 2024).
- Glassdoor, National Grid graduate scheme interviews: 403; questions, video interview length, assessment centre length and timelines from search listings, candidate-reported.
Tags:
Share this article:
Recording a one-way video interview for National Grid? Get help on each question.
OphyAI's desktop app has a One-way Interview mode for HireVue and Spark Hire style interviews. It reads each question as it appears on your screen and suggests an answer in an overlay that is hidden from screen sharing. Rehearse first with free Interview Practice.
On your phone? Practice your video answers in the OphyAI app. One-way Interview mode runs in the Mac and Windows app.
Hidden from screen share and recording; a webcam or a person in the room can still see your screen.
Related Articles
Canadian Tire Interview Process: 4 Steps, Dealer Hiring & 20 Questions
Company Guides
Canadian Tire interview guide 2026: the 4-step hiring process, how Associate Dealer stores hire, 20 store and corporate questions, CAD pay and a prep plan.
Read more →
CIBC Interview Process 2026: 5 Steps, Assessments & 18 Questions
Company Guides
CIBC interview guide 2026: the 5-step hiring process, attribute-based and video assessments, branch role-plays, Capital Markets rounds, coding tests, CAD pay.
Read more →
Hydro One Interview Process 2026: JAC Apprenticeships & 20 Questions
Company Guides
Hydro One interview guide 2026: the PWU/Hydro One JAC powerline apprentice route, new grad engineering, call centre testing, 20 questions and posted CAD pay.
Read more →